DoorVision 3D and the Golden Thread — Building Safety Act Evidence on Every Fire Doorset
What the Building Safety Regulator actually wants
The Building Safety Act 2022 introduced a duty on Accountable Persons and Principal Designers to maintain a "Golden Thread" of information for higher-risk buildings — buildings 18 metres or seven storeys high containing at least two residential units. For fire-protected openings that means a continuous, accurate, accessible record from specification through to in-service inspection.
In practice that means the Building Safety Regulator (BSR) expects to be shown:
- What was specified.
- What was supplied.
- What was installed.
- What was inspected, when and by whom.
- How any defects were remediated.
For most schemes, point 1 and point 2 are where the Golden Thread breaks. Specifications drift. Schedules are revised. Sub-contractors substitute components. The paper trail goes cold.
DoorVision 3D — the UK's only real-time, browser-based 3D fire doorset configurator — closes that gap by making the specification, the supply record and the build record the same artefact.
How DoorVision 3D produces Golden Thread evidence
Every doorset configured in DoorVision 3D produces a captured high-resolution image of the exact assembly. The image is:
- Timestamped at the moment of capture.
- Tied to the order reference when the PO is raised against Stark Contracts.
- Archived against the workshop build log in our BM TRADA Q-Mark certified Lincoln workshop.
- Linked to the BM TRADA Q-Mark certificate for the leaf, frame, intumescent system and ironmongery package.
- Issued back to the building file at handover, alongside the install record.
Combined with a Stark post-occupancy fire door inspection and the in-service maintenance log, the result is a defensible end-to-end record on every fire-protected opening.
Mapped to the BSR's expectations
| Golden Thread requirement | Traditional evidence | DoorVision 3D evidence | | --- | --- | --- | | What was specified | Excel schedule + ironmongery schedule + frame elevation | Captured 3D image of the exact assembly | | What was supplied | Delivery note + invoice | Captured image matched to order ref and workshop build log | | What was installed | Photograph (sometimes) | Captured image + install photographs against same order ref | | Certification | Q-Mark certificate (manually filed) | Q-Mark certificate auto-linked to the captured image | | In-service inspection | Inspection report | Inspection report linked back to the captured spec image |
Why this matters under enforcement
Fire door breaches under the Regulatory Reform (Fire Safety) Order 2005 now carry fines up to unlimited amounts on indictment. When the BSR or a Fire and Rescue Authority asks for the Golden Thread on a fire-protected opening, the Responsible Person has two options: produce it, or accept that they cannot evidence compliance. A captured DoorVision 3D image — timestamped, order-linked and archived against the Q-Mark certificate — is one of the strongest pieces of evidence available on the UK market.
What it does not replace
DoorVision 3D produces Golden Thread evidence on the doorset itself. It does not replace:
- The fire engineer's compartmentation strategy.
- The Principal Designer's overall building safety case.
- The Responsible Person's in-service inspection and maintenance regime.
- The third-party certified BM TRADA Q-Mark inspection.
It does replace the assumption that the spec, the supply, the install and the inspection record will agree with each other later.
How to start using it on a live building
- Open DoorVision 3D. Configure the standard variants for the building.
- Capture each variant. Save the image against the building file with a consistent naming convention (block / floor / door type).
- Raise the order to Stark referencing the captured images. The Lincoln workshop builds against the same images.
- On install, photograph the fitted doorset against the same opening reference.
- At first inspection, our digital reporting workflow ties the inspection report back to the same opening reference.
The Responsible Person now has a continuous, ordered, defensible record for every fire-protected opening in the building.
Further reading
- DoorVision 3D — the dedicated landing page
- Building Safety Act 2025 and fire doors — what changed
- DoorVision 3D for architects and specifiers
- DoorVision 3D for main contractors
- Why fire door certification matters
Need help mapping DoorVision 3D into your Golden Thread workflow? Call 01522 775570 or email Enquiries@Starkcontracts.co.uk. We can walk through it against your building safety case.