The Summer Window: School & Office Refurbishment in Mansfield
The Summer Window: School and Office Refurbishment in Mansfield
Every school business manager in Mansfield knows the arithmetic: six weeks of holiday, a maintenance list that needs nine, and a budget that needs the lot done in four. The contractors who deliver in that window are the ones who do the work before the window opens.
The joinery itself
Storage walls, reception counters, washroom units, break-out kitchenettes, classroom cabinetry — workshop-made, delivered finished, installed by the team that built them.
One contractor, whole package
Refurbishments almost always uncover fire door issues. Ours include fire door inspection and remedial works in the same programme — no second contractor, no second mobilisation.
How a school project runs
Survey during term time, design and quote agreed with the bursar or site manager, workshop assembly in early summer, installation across the holiday window. Corridor doors are replaced as certified pre-hung doorsets, and any doors worth saving go through our remedial works programme instead — which can save a significant share of the door budget.
Doors: replace what is beaten, repair what is not
A corridor of tired doors does not automatically mean a corridor of new doors. We survey every leaf: doors worth saving go through remedial works — new seals, closers, hinges, gap correction to BS 8214 — and only the genuinely beaten ones are replaced with certified pre-hung doorsets.
Plan your window
Call 01522 775570 or email Enquiries@Starkcontracts.co.uk — the earlier the survey, the more of the window we can use.