Fire Risk Assessment Cost UK 2026: What You'll Actually Pay

Fire Risk Assessment Cost UK — The Honest Answer

If you've been searching "fire risk assessment cost UK" you'll have seen quotes anywhere from £150 to £5,000+ and very little explanation of why. The honest answer is that FRA pricing is driven by three things: the type of FRA (1–4), the size and complexity of the building, and the experience and indemnity of the assessor.

For most buildings in 2026, expect to pay:

| Building type | Typical FRA cost (ex VAT) | | --- | --- | | Small single-occupancy commercial unit | £250 – £450 | | Standard HMO (3–6 bedrooms) | £200 – £400 | | Block of flats, 1–10 units (Type 1) | £350 – £700 | | Block of flats, 11–30 units (Type 1) | £600 – £1,200 | | Mid-rise block (Type 2 with destructive sampling) | £900 – £2,500 | | High-rise (over 18m) Type 3 or Type 4 | £1,500 – £6,000+ | | Care home, school or NHS estate | £600 – £3,500+ |

These are the bands we see most often across Lincolnshire and the East Midlands. They're a guide — not a quote.

What's a Type 1, 2, 3 or 4 FRA — and Why Does It Matter For Price?

Most landlords don't realise FRAs come in four types under PAS 79-2 / BS 9999 guidance, and the type drives a lot of the cost:

  • Type 1 — Non-destructive, common parts only. The default for most residential blocks. Visual inspection of escape routes, fire doors, signage, alarms, compartmentation as visible. No sampling inside flats.
  • Type 2 — Destructive, common parts only. Adds limited opening-up of construction (ceilings, risers, voids) to verify compartmentation. Used where there's reason to suspect hidden defects.
  • Type 3 — Non-destructive, common parts and a sample of flat interiors. Includes flat entrance doors and the fire-separating elements inside a sample of dwellings.
  • Type 4 — Destructive, common parts and flat interiors. The most thorough. Required after major incidents, post-Grenfell remediation works, or where compartmentation evidence is missing.

Type 1 is the most common and the cheapest. Type 4 is the most thorough and the most expensive — sometimes 5–10× a Type 1 on the same building.

What Drives the Price Up or Down

Building size and door count. An FRA on a 6-bed HMO with 8 internal doors takes 2–3 hours on site. A 30-storey tower with 400 doors takes a team several days. Pricing tracks site time, door count and report length.

Building height and risk class. Anything over 11m (about 3 storeys) falls under the Fire Safety (England) Regulations 2022 with extra duties. Over 18m falls under the Building Safety Act 2022 as a higher-risk building. Both add scope and price.

Assessor competence and indemnity. The Fire Safety Act 2021 made the duty to use a "competent person" explicit. A qualified third-party-certified assessor (IFSM, IFE, BAFE SP205) costs more than an unaccredited one — but produces a defensible report your insurer, fire service and (if it ever comes to it) the courts will actually accept.

Use class. Care homes, schools, hospitals and HMOs have higher life-safety risk than offices or warehouses, and the FRA scope reflects that.

Existing documentation. If you've got up-to-date drawings, fire strategy, alarm logs and previous FRAs ready, the assessor moves faster. If we're starting from scratch, the report takes longer.

What You're Actually Paying For

A compliant FRA is not "a man with a clipboard" — it's a written, dated, signed report covering:

  • The hazards and the people at risk
  • The condition and adequacy of escape routes, fire doors, compartmentation, detection, alarms, emergency lighting, signage and firefighting equipment
  • A prioritised action plan with timeframes
  • A clear date for review
  • The assessor's competence and indemnity

Anything less doesn't meet the Regulatory Reform (Fire Safety) Order 2005 and won't stand up to a fire service audit. Cheap FRAs that fail an enforcement inspection cost far more than a proper one — both in re-survey fees and in the fines, which can reach up to unlimited amounts on indictment for serious failures.

How Stark Contracts Prices FRAs

We quote FRAs as a fixed fee after a 10-minute scoping call. The variables we ask about are: building type and use, number of storeys, approximate floor area, number of dwellings or units, number of fire doors, and whether you have any existing fire safety documentation. With that we can give you a firm price and a delivery date.

We're BM TRADA Q-Mark certified for fire door installation, inspection and remedial works — so where an FRA flags fire door defects, we can quote and deliver the remedial works in-house. One contractor, one report, one audit trail. That alone usually saves clients 20–30% compared to splitting the FRA and the fire door work across two firms.

What an FRA Saves You

Quoting price without quoting saving is misleading. A competent FRA on a residential block typically:

  • Identifies fire door defects before they trigger an enforcement notice (which can shut a building)
  • Reduces insurance premiums (insurers ask for the FRA date before quoting)
  • Demonstrates the "competent person" duty under the Fire Safety Act 2021
  • Provides the legal defence a Responsible Person needs if there's ever an incident

The fines for non-compliance with the Regulatory Reform (Fire Safety) Order 2005 can reach up to unlimited amounts on indictment. The cost of a proper FRA is, in every case we've seen, a rounding error against that risk.