Fire Door Requirements for New Builds in the UK (2026 Update)

Fire Door Requirements for New Builds in the UK

If you're building new residential or commercial properties in the UK, fire doors are a mandatory requirement under Building Regulations. Here's what you need to know in 2026.

Building Regulations: Approved Document B

Approved Document B (Fire Safety) sets out fire door requirements for new builds:

Residential Buildings

  • All dwellings: FD30 fire doors required on habitable rooms opening onto escape routes
  • Flats above 4.5m: FD30S doors on flat entrance doors (with smoke seals)
  • Buildings over 11m: Enhanced requirements including FD60 on staircase enclosures
  • Buildings over 18m: Highest tier — FD60 throughout protected shafts, additional measures required

Commercial Buildings

  • Fire doors required wherever a fire-resisting partition or wall has a doorway
  • Rating must match the wall's fire resistance (typically FD30 or FD60)
  • Self-closing devices mandatory on all fire doors

The Building Safety Act Impact

For higher-risk buildings (over 18m / 7+ storeys), the Building Safety Act 2022 adds:

  • A gateway process — fire door specifications must be approved at design stage
  • The golden thread — all fire door data must be digitally recorded from installation
  • Accountable Person responsibilities — ongoing maintenance obligations from day one

Specification Best Practice

For new build fire doors, we recommend:

  1. Use pre-hung fire door sets — factory-assembled for guaranteed compatibility
  2. Specify BM TRADA Q-Mark certified installers — ensures competent installation
  3. Plan for maintenance access — ensure all fire doors can be inspected and maintained
  4. Digital documentation — start the golden thread from installation day

Working with Architects and Contractors

Stark Contracts works with architects, main contractors, and developers across Lincoln, Nottingham, Derby, and the East Midlands to specify and install fire doors in new builds. We provide:

  • Technical specification support — advising on ratings, ironmongery, and finishes
  • Pre-hung door set manufacture — built to exact specifications in our Lincoln workshop
  • BM TRADA certified installation — ensuring every door meets Building Regulations
  • Handover documentation — complete records for the building's golden thread

Our New Build Track Record

We've supplied and installed fire door sets for:

  • Council new-build housing programmes
  • Private residential developments
  • Student accommodation
  • Commercial office and retail projects
  • Schools and healthcare facilities

Specifying fire doors for a new build? Call 01522 775570 or email Enquiries@Starkcontracts.co.uk.